Multi phase construction to Memorial Facility
This was a 4 Phase Location Site.
Excavation and Grading + Subgrade prep work for all areas.
Concrete Curbs, Asphalt & Interlock installation. Topsoil planting and restoration works.
Privacy Fencing, Seating Furniture installation.
Other phases included parking and road construction, condrete curbing and sidewalk. Two wood framded pedestrian walking bridges, wood frame deck with cantilever shade structure in 2 locations. Extensive interlock, seeding and sodding.
Our team worked carefully and respectfully with the owner to accommodate the need for maintaining the quiet and tranquility required of the place.
Due to the nature of the site, improvising work schedules on almost a daily basis was a priority.
We Service the Residential, Corporate, Commercial and Public Development Sectors.
Working closely with architects, engineers and developers, Our skilled team has tremendous experience working on projects across the full spectrum of size and scope
When considering your next project, contact LATITUDE67